GreenBuild Eco-City Project | HUASHENG

case

GreenBuild Eco-City Project

Application area: building exterior wall insulation system
Customer pain point: traditional insulation materials are flammable and have high energy consumption
Solution: B1 flame retardant EPS particles (density 22kg/m³)
Quantitative results:
• The overall energy saving rate of the building increased by 14%
• The project cycle was shortened by 18 days (compared with rock wool construction)
• Obtained LEED green building gold certification

GreenBuild Eco-City Project